
Add to Cart
New Condition Plastic cap lip slitting folding machine
Introduction
Cap slitting machine is specially scored for the pilfer-proof purpose and designed to cut the bird-ges on caps to achieve the security band. This machine is widely used for the cap cutting process of drinks, medicines, cosmetics and so on. All the machine are certificated by European Community and acquired the CE certification.
Advantages
1) Shorter cycle time, 14 circles/minute (save time)
2) Less energy consumption, lower production temperature(save energy)
3) High productivity, triple capacity than injection machine(save cost)
4) Eco-friendly, caps will not decompose(save resource)
5) Low cost, each cavity is independent for maintenance(save cost)
6) One can operate the machine instead of several workers (save manpower)
7) Adopts hydraulic runner which advantage is avoid leaking oil, cooling water runner to cool caps and devise rapidly, reduce abrasion and increase mold life. (save cost)
Slitting machine specification | |||
Type | LT-28 | Total power | 0.7KW |
Cap diameter | 18mm-60mm | Supply voltage | 220V,50Hz |
Cap height | 12mm-50mm | Compressed air consumption | 0.5m³/min |
Capacity | 15000-20000pcs/hr | Machine weight | 160KG |
Installed electrical power | 1KW | Size(L*W*H) | 1700mm*700mm*1250mm |
TERMS | |
PRICE TERMS | EXW price |
PAYMENT TERMS | T/T 30% for deposit,70%balance after BUYER approve all the machine and before shipment |
DELIVERY | Upon receipt of deposit, all machines need 50-55 working days to be completed. |
PACKING | Standard Sea Shipping Packing |
GUARANTEE | During normal operation, 18 months guarantee period is valid for all machines. |
AFTER-SALES SERVICE
|
• When the above listed machines are completed, the Buyer shall dispatch their qualified engineers to inspect their machines in manufacturer’s factory. The produced plastic caps from these machines should be checked against with the samples which given by the Buyer before, and inspect approval by buyer. • When the inspection, testing is done, the Seller will ship machines ASAP. • Upon arrival of the machines at the Buyer’s factory, the Seller shall dispatch an engineer to the Buyer’s factory to install, debug the machines until all machines can produce qualified plastic caps. And the engineer also should train their technician to operate machine. • Engineer’s tour including round-trip air tickets, lodging, boarding and transportation will be borne by the Buyer. • Time for installation and debugging in Buyer’s factory: 5-7DAYS
|
Main pictures: